The initial response to the new arrivals was indeed overwhelming as you saw the crowd standing around Baskerville Jct. Station.
However, inspections need to be made before they are pressed into service. 1/87 Senior Manager Sir John R. made his initial report on both engines. Below are the details and his report can be seen here as well Initial A.P.R.R. Locomotive Inspections
ATLANTIC PACIFIC RAILROAD
REPORT OF INITIAL LOCOMOTIVE
INSPECTION
Locomotive Type: GP38-2 Builder:
EMD Delivery Date: 03/09/1972
Road Number(s): 305 Paint:
Orange / Black ATLANTIC PACIFIC RAILROAD
Propulsion: Diesel Electric Engine: 645E
Horsepower: 2,000 Aspiration: Roots Blower
Truck Type: B-B Build
Date: 02/01/1972
Train Brake: Railway Air
Brake Dynamic Brake: No
Gear Ratio: 62:15 Maximum Speed: 65 mph
Total Length: 59’02’’ Weight: 250,000
lbs
Tractive Effort starting:
61,000 Tractive Effort continuous: 54,700
@11 mph
Multiple Unit Capability:
Yes Traction Motors: GM-77
Notes:
A.P.R.R. EMD GP38-2 #305
received this date after transfer from EMD via Penn Central RR.
All components and
appliances present at time of receipt.
Tested this date on revenue
train RO-1 while m.u.ed with A.P.R.R. GP38-2 #306.
Initial inspection is
satisfactory.
Reporting Officer: Senior
Manager: John R (1/87th scale)
_____________________________________________________________________________________
ATLANTIC PACIFIC RAILROAD
REPORT OF INITIAL LOCOMOTIVE
INSPECTION
Locomotive Type: GP38-2 Builder:
EMD Delivery Date: 03/09/1972
Road Number(s): 306 Paint:
Orange / Black ATLANTIC PACIFIC RAILROAD
Propulsion: Diesel Electric Engine: 645E
Horsepower: 2,000 Aspiration: Roots Blower
Truck Type: B-B Build
Date: 02/01/1972
Train Brake: Railway Air
Brake Dynamic Brake: No
Gear Ratio: 62:15 Maximum Speed: 65 mph
Total Length: 59’02’’ Weight: 250,000
lbs
Tractive Effort starting:
61,000 Tractive Effort continuous: 54,700
@11 mph
Multiple Unit Capability:
Yes Traction Motors: GM-77
Notes:
A.P.R.R. EMD GP38-2 #306
received this date after transfer from EMD via Penn Central RR.
All components and
appliances present at time of receipt.
Tested this date on revenue
train RO-1 while m.u.ed with A.P.R.R. GP38-2 #305.
Initial inspection is
satisfactory.
Reporting Officer: Senior
Manager: John R (1/87th scale)
There's one more report due in over the next few days from 1/87th Senior Engineer Ed before they can be pressed into revenue service. Check back next week for the final report and send off of the engines to revenue service!
Looks like Sir John did a complete and thorough inspection of the new APRR power. With Senior Engineer for life, E.E.’s blessings, the APRR will be ready to put them into service. Nice write up and information!
ReplyDeleteThanks Brian!
DeleteNice job getting the reports posted Sir Neal!!!
ReplyDeleteThey look good on the blog. But not as good as those new engines!
Thorough inspection reports! Lots of neat information to glean from them.
ReplyDelete