Welcome back to the continuation of Penn Central Car Movement #83 on the A.P.R.R.!
We'll jump right in as the crews are ready to send out two trains - one for the N.Y.C.T.L. and one for the K.P.D.
AP #105 with 1:87 Scale Mark and conductor Jim will pull the outbound freight cars destined for the K.P.D...
Here's the build for the freight going to the K.P.D.
PC SD35 #6014 will take the outbound train from the AP crew at the yard limits for the trip up north. They will hold as there's inbound traffic in front of them. Since they're still on AP track, they will need to wait for permission to proceed....
Meanwhile, over at Rock Ridge East Yard, 1:87 scale Engineer NJ John will build the outbound train for the N.Y.C.T.L...
Here's a little clip of the moves for the train destined for the N.Y.C.T.L....
The outbound trains are ready to depart. There's some inbound traffic coming to Rock Ridge, so they'll fleet the outbound trains one at a time as the inbound approaches from the east...
First train out will be PC #6031 for Terminal Yard on the N.Y.C.T.L. followed by PC #6014 for West Mill on the K.P.D. Also, watch for AP #106 making his moves.....
DISCLAIMER: THE ENGINES IN THE VIDEO ARE NOT GP38-2 ENGINES. THEY ARE SD35 ENGINES. SORRY FOR THE CONFUSION. TYPING LATE AT NIGHT CAUSES ERRORS BEYOND MY CONTROL! UGH!!!
Thanks for reading!
To: Rock Ridge / West Mill
ReplyDeleteFrom: Terminal Yard
Acknowledge work of AP 105.
Acknowledge dispatch of PC Train RW-1 from Rock Ridge to Weehawken with freight cars for West Mill.
Acknowledge dispatch of PC Train RW-3 from Rock Ridge to Weehawken with freight cars for Terminal Yard.
Acknowledge AP 106 handling intra layout movements of PCCM cars.
Terminal Yard out...
Cool looking engines and trains leaving Rock Ridge!! The Terminal Yard will be standing by to receive them!!!! I liked the choice of motive power for the RW-1 and RW-3. The AP105 and AP106 continue to be impressive additions to the Rock Ridge Yard operations!!! Thanks for another fine installment Sir Neal!!!
To: Rock Ridge, Terminal Yard
ReplyDeleteFrom: West Mill
Acknowledge work of AP 105, the dispatch of PC Train RW-1 and PC Train RW-3.
West Mill out.
The important interchange between the APRR and the Penn Central is clearly demonstrated as trains for West Mill and Terminal Yard are assembled by the APRR and handed over to the PC. I enjoyed the video and photos of the yard work and the video roll-bys of both trains. West Mill is prepared to receive the cars heading its way!