Wednesday, November 18, 2026

In Between My Virtual Op Sessions - What Happens On The APRR?

Hello everyone and welcome to a special blog post about the Atlantic Pacific Railroad. 

As you know, Sir John and I have our ongoing NY-NJ Ops sessions, which are thoroughly enjoyable to do. Many of you comment about our layouts and trains, especially when we introduce new engines, cars and industries. The behind the scenes setups we do are tedious and take a lot of planning, especially by Sir John (A BIG THANK YOU TO YOU, SIR JOHN!),

So, what happens in between our virtual op sessions? Sir John is always busy with many updates about freight cars, engines and more. On my railroad, I host operating sessions with 4-6 other people! As with our virtual ops, I have to reset my layout to a degree. Some of the virtual ops cars come off as they are not needed or interfere with my operating sessions. In addition, I have to make a list of the 'jobs' that are going to happen during my op sessions. Once I have the list of what jobs I would like to run, I make sure trains are in position.

Here's my list for my November 18, 2026 operating session:

TRAIN LINE UP
#____PC 3144 – LOCAL TRAIN – MIKE’S LUMBER – 7 CARS
#____AP 106/107 – LOCAL TRAIN – IDEAL AUTO PARTS – 3 CARS 
#____AP 303 – LOCAL TRAIN – FREIHOFERS / MARCAL – 5 CARS
#____AP 302 – LOCAL TRAIN – THREE AMIGOS – C&P REST. W/REEFERS – 10 CARS
#____AP 200 – MANIFEST TRAIN – 12 CAR
#____CR 3276 – STEEL TRAIN – 11 CARS
#____PC 7848 – JUICE TRAIN #1 – 9 CARS
#____CR 7883 – JUICE TRAIN #2 – 9 CARS
#____PC 1675 – COAL TRAIN – 12 CARS 
#____AP 2350 – MANIFEST TRAIN – 15 CARS FROM ROCK RIDGE TO STAGING
#____PC 7783 – TRAILER TRAIN – 8 CARS 
#____PC 7983 – MANIFEST TRAIN – 11 CARS
#____PC 2229 – MANIFEST TRAIN – 11 CARS
#____AP 307 – LOCAL – LOCAL – SHAPELESS STEEL / TANK CARS 13 CARS
#____CARGILL MOVES – COVERED HOPPERS/TANK CARS TO/FROM RR YARD
#____NH/CP/LIRR – RDC CARS / PASSENGER TRAIN

Once I have this in place, I make sure the railroad is staged...

This is Rock Ridge Yard. A double ladder yard with access from the North (CP Rock) and the South (CP South).


Ideal Auto Parts & Electronics

Marcal Paper and Freihofers Bakeries

Mike's Lumber

C&P Restaurant Supply

Three Amigos on the left; Tank Terminal on the right

Reynolds Intermodal Terminal

Shapeless Steel


The next 3 images show the industries on the Rock Ridge Industrial Complex. There's a dedicated operator at the location. Not only do they switch out the industries in conjunction with the Rock Ridge yardmaster, they will (at times) bring up the trains to switch, usually at Tropicana and the Power Plant

Tropicana

Power Plant aka R.M.O. Electric

Cargill

So, where are the rest of the cars to make the moves? They're on the lower level in staging...

North Staging in the rear, South Staging in the front - view from the west end of the yards

North staging. Both staging sections have the ability to hold up to 18 sets of trains with an average train length of 10-15 cars. 

South staging in the front, North staging in the background - east end of the yard.

Now these local jobs need engines, and I have one person who is the engine hostler and will do double duty as the west end tower operator of the lower level staging tracks. 
Here's his little place to homestead...

Richmond Hill Engine Terminal

The last step is the Dispatcher, which is usually me. I did have one guy who needed to get some of his NMRA Achievement Programs use my railroad to get his Dispatchers Certificate. He put in the hours/sessions on my railroad dispatching and yardmaster duties.

Here's what I have for my op sessions...

Yardmaster duties are posted...

Train sets in staging. This is the east end of South Staging...

Dispatchers area...


West end of staging...

As of today, I am ready to host my operating session! Five guys will come over and usually I'll give Kai or NJ John yardmaster duties. That leaves Jim and Mark as engineers to run jobs and whoever is not yardmaster will the the 3rd engineer. Norman has the engine terminal and lower level west end staging duties. I'll handle the turnouts at the east end of staging, and of course dispatching my railroad. Total running time for my sessions is usually 2 1/4 - 2 1/2 hours, depending on who is doing certain jobs.

I will tell you that despite the time and energy I put into setting this up, I get a lot of satisfaction, enjoyment, as well as some laughs having the guys run my railroad. It's all about having fun and a good time.

Thursday, I'll post an 'After Action Report' and let everyone know how it went, and if I can take some pics of the guys running my railroad.

Thanks for reading!

3 comments:

  1. The operations never stop in Rock Ridge!!! True about the time involved to set up the sessions whether actual or virtual. At the end of the setup which is pretty enjoyable in itself, the real fun begins. Thanks for the shoutout!! I am looking forward to seeing the after action report!!

    ReplyDelete
    Replies
    1. Thank you very much Sir John! Been a while since I hosted a session, and the railroad is ready!

      Delete
  2. Well done Sir Neal and Sir John, such a lot of organisation, prep and management! I can't compete with all your rail traffic etc. but I have finally finished the Bozo River gorge section and will be running the first train across the trestle very soon (if I can round up the crew at Cuspidor yard). Next comes getting the turntable installed and finally, after that, is the worst job of all, installing switch machines and wiring them up. Oh Bliss! After that it gets to be a hobby again! Cheers!

    ReplyDelete