AP Train RE-4 heads back to Rock Ridge Yard...
AP Train RE-4 arrives at CP South and checks in with Tower Operator Rich...
Jim ties down in the yard...
Kai starts to work the train...
First set of cars gets dropped on A/D track 'B'...
Before Kai spots the rest of the cars, he grabs the 3 cars at American Hardware, They're loaded with parts to be delivered to Bendix at the Terminal Warehouse & Cold Storage building...
Those cars get spotted on A/D track 'B'...
The rest of the cars will be dropped on A/D track 'C'...
Jim wasn't quite finished. NJ John made him tie down on East Ladder track #2 as he needed the room. Don't mess with NJ John!
Kai turns over his engine to Norman so he can make a run to Shapeless Steel and pick up some steel slabs for Mid Island Steel via the LIRR. The handoff for them is at the Empire Belt RR's North Side Yard who will hand it off for the final leg...
Norman checks in with Rich for routing to Shapeless Steel...
The signal should come up soon, unless Little Jamaica Tower Operator wants to make Norman wait. He eventually was given the railroad...
A short time later, Norman picks up the 3 PC gondolas and heads back to the yard...
Norman checks in with Rich for track assignment...
Down the west ladder it is!!
AP #102 had Dan in the cab and will pull these cars and add them to the outbound train...
Meanwhile, there are 4 cars over at Tropicana that need to come over to the yard. Since the AP yard crews are busy, Tropicana will have their crew bring over the cars. Three are for C&P Restaurant Supply and the Green Tropicana will head to Key Food on the NYCTL...
Making its FIRST appearance ever is Tropicana NW2 #5281. This little guy will bring the cars over to Rock Ridge Yard...
Tropicana NW2 #5281 in action!!
They have the signal and slowly shove over to Rock Ridge Yard...
The APRR yard crew welcomes the new visitors...
They quickly depart, and head back to Tropicana. The AP Yard crew will handle it from here...
Kai adds the car to the outbound freight...
The other 3 cars are dropped on West Ladders 3 & 5 until C&P Restaurant Supply calls for them. Let the demurrage charges begin!!!
We'll cut it here for today. Tomorrow they'll start to build the outbound trains as there's more freight coming in to the yard as well...
Thanks for reading!!
To: Rock Ridge Yard
ReplyDeleteFrom: Terminal Yard
Acknowledge Rock Ridge Yard crews to work Marcal, Freihofer's Bakery and Shapeless Steel.
Acknowledge engineer Jim assigned to AP Train RE-4 powered by AP engine 302.
Acknowledge NY-NJ freight traffic pulled from above listed industries and delivered to Rock Ridge Yard.
Acknowledge Kai working Rock Ridge Yard in AP engine 101.
Acknowledge Norman taking the seat in the AP101 and heading to Shapeless Steel.
Acknowledge AP101 delivering three NY-NJ gondolas of steel slabs to Rock Ridge Yard.
Acknowledge Dan working Rock Ridge Yard in AP engine 102.
Acknowledge Tropicana NW-2 #5281 making its debut in the Tropicana Plant.
Acknowledge Tropicana Train TR-1 delivering "the juice" to Rock Ridge Yard.
Acknowledge Train TR-1 returning to Tropicana.
Acknowledge demurrage charges being accrued!!!
Terminal Yard out...
Awesome work Sir Neal!!! The APRR guys really got the job done today!!! The new Tropicana NW2 #5281 was a nice surprise!!! This will have me digging thru my own Tropicana reefers so we may be able to add "juice traffic" to our ops to keep the 5281 busy and in front of the camera. A very enjoyable post showcasing the many moving parts needed to keep the NY-NJ traffic moving and profitable.