Sunday, February 6, 2022

An Update About My Operating Sessions

Greetings followers of the Atlantic Pacific Railroad and my blog!

It’s been quite some time that I gave folks an update on my operating sessions. Since my last post in August 2020, the operating scenarios have been vastly improved over time.

I started to have these operating sessions with printed jobs on index cards. It started out with a total of 4 people. Dispatcher, yardmaster and two engineers running trains. I then added two more people over time for a total of 6. This gives me dispatcher, yardmaster, secondary industries, 2 engineers and an engine hostler! Yes, I have one person who gets the engines ready at the engine terminal, along with a caboose, for trains that will be run during the operating session.

Here’s the information that each person will get for his assignment.

Yardmaster…

YARDMASTER NOTES – TODAY’S JOBS

LOCAL TRAINS

GMTX 2346 LOCAL – MIKES LUMBER   TRACK 4 – 4 BOX CARS 

GMTX 2103 LOCAL – SHAPELESS STEEL / C&P RESTAURANT SUPPLY

USE REEFERS & GONDOLA CARS FROM INBOUND CSX 5970 /5965

AP 307 LOCAL – THREE AMIGOS / TANK TERMINAL

USE FREIGHT FROM INBOUND AP 601/600

---------------------------------------------------------------------------------------------------------------------------

INBOUND TRAINS                         OUTBOUND TRAINS   

CSX 5970/5965 - MANIFEST          AP 2360/2370 - MANIFEST

AP 601/600 – MANIFEST                CR 3276/3278 – MANIFEST

AP 302/304 – MANIFEST                CSX 2186/2623 – MANIFEST

CSX 1544/1557 – JUICE                  KCS 4783  – JUICE

 

Engine Hostler…

HOSTLER MOVES TO /  FROM RICHMOND HILL ENGINE TERMINAL (R.H.E.T.) 

ENGINES TO / FROM R.H.E.T. – CABOOSE NEEDED FOR ALL ENGINES

LOCAL TRAINS

GMTX 2346 LOCAL – MIKES LUMBER   TRACK 4 – 4 BOX CARS 

GMTX 2103 LOCAL – SHAPELESS STEEL / C&P RESTAURANT SUPPLY

AP 307 LOCAL – THREE AMIGOS / TANK TERMINAL

 ---------------------------------------------------------------------------------------------------------------------------

INBOUND                                         OUTBOUND 

CSX 5970/5965                                AP 2360/2370

AP 601/600                                      CR 3276/3278

AP 302/304                                      CSX 2186/2623

CSX 1544/1557                                        KCS 4783

 

Rock Ridge Secondary Operator…

TROPICANA REEFERS TO/FROM ROCK RIDGE YARD

USE TROPICANA #24 FOR MOVES

CONTACT ROCK RIDGE YARDMASTER FOR MOVES TO / FROM YARD

OUTBOUND PULL – TRACK 2 – 2   TRACK 3 – 6  TRACK 4 – 6

YARDMASTER WILL NOTIFY WHEN INBOUND CARS ARE READY TO BE PICKED UP

INBOUND – 2 CARS TO TRACK 2 – 5 CARS TO TRACK 5 – 5 CARS TRACK 6

TOTAL CARS MOVED – 15 OUT / 12 IN

 ----------------------------------------------------------------------------------------------------

CARGILL MOVES TO/FROM ROCK RIDGE YARD

USE AP #100 FOR MOVES

CONTACT ROCK RIDGE YARDMASTER FOR MOVES TO YARD

OUTBOUND MOVES – 4 TANK CARS EACH FROM TANK TRACKS 1&2 TO ROCK RIDGE – 6 COVERED HOPPERS TRACK 1 TO ROCK RIDGE

ONCE OUTBOUNDS ARE CLEAR MOVE 4 TANK CARS EACH FROM TRACKS 3&4 TO TANK CAR TRACKS 1&2 – MOVE COVERED HOPPERS FROM GRAIN TRACK 2 TO TRACK 1

INBOUND MOVES – 6 COVERED HOPPERS TO GRAIN TRACK 2 – 4 TANK CARS EACH TANK TRACKS 3&4

TOTAL MOVES – 14 OUT / 14 IN

 --------------------------------------------------------------------------------------------------------

COAL CARS TO/FROM ROCK RIDGE YARD

USE AP #100 FOR ALL MOVES

CONTACT YARDMASTER FOR MOVE TO YARD

PULL EMPTY COAL HOPPER CARS FROM POWER PLANT TRACK 1/2

MOVES LOADED COAL HOPPERS FROM TRACKS 3&4 TO TRACKS 1&2

WHEN NOTIFIED, PICK UP COAL HOPPERS FROM ROCK RIDGE YARD – DROP 2 COAL HOPPER CARS ON TRACKS 3&4

TOTAL CARS MOVED – 4 OUT / 4 IN


Engineer Moves...

ENGINEER MOVES

CSX 5970/5965 – MANIFEST TRAIN SO. STAGING TO ROCK RIDGE

AP 2360/2370 – MANIFEST TRAIN ROCK RIDGE YARD TO SO. STAGING

CSX 1544/1557 – TROPICANA JUICE TRAIN NO. STG. TO ROCK RIDGE

KCS 4783 – TROPICANA JUICE TRAIN ROCK RIDGE TO NO. STAGING

AP 302/304 – MANIFEST TRAIN SO. STAGING TO ROCK RIDGE

CR 3276/3278 – MANIFEST TRAIN ROCK RIDGE TO SO. STAGING

GMTX 2346 – LOCAL TRAIN – MIKES LUMBER

GMTX 2103 – LOCAL TRAIN – SHAPELESS STEEL / C&P REST. SUPPLY

AP 307 – LOCAL TRAIN – THREE AMIGOS WHSE / TANK TERMINAL

AP 302 – MANIFEST TRAIN – SO. STAGING TO ROCK RIDGE

CSX 2186/2623 – MANIFEST TRAIN ROCK RIDGE TO SO. STAGING

CONTACT DISPATCHER FOR TRACK POSITION AT STAGING FOR ALL OUTBOUND & INBOUND TRAINS!


Dispatcher gets a copy of everything above plus…

Consists…

CONSIST       ENGINE              CONSIST      ENGINE

 

127      M&E 18 M&E 19            114    

126      AMTRAK 95 / 139         113    

125      CSX 5930 CSX 5931      112     AP 2370 AP 2360

124      CSX 6898 CSX 6899      111     CSX 1153 CSX 1177

123      CSX 2186 CSX 2623      110     AP 601 AP 600

122      AP 302    AP 304            109     CR 3276 CR 3278

121      AMTK 161 AMTK 188    108    

120      AP 2350 AP 2340           107      AP 306 AP 305

119      CP 2023 CP 9049           106      CSX 5972 CSX 5966

118      CSX 2042 CSX 2015      105     

117      AP 106 AP 107               104      CSX 1557 CSX 1544

116      CSX 5970 CSX 5965      

115      CSX 2806 CSX 2810             


Consist numbers are what we use in the world of DCC. I can call any engine in consist and both engines will move, depending on how the engines are placed on a train. If engines are elephant style, you would enter the lead engine road number into the throttle and both engines (or multiple engines), will move together. If engines are put back to back, the road number on the engine you call up will determine the direction they move…

Trains in Staging…

NORTH STAGING

TRACK 1 W CSX 1544 – JUICE TRAIN

TRACK 1 E AP 2340 – STEEL TRAIN

TRACK 2 W CSX 4697 – MANIFEST TRAIN

TRACK 2 E AP 305 – MANIFEST TRAIN

TRACK 3 W AP 601 – MANIFEST TRAIN

TRACK 3 E CSX 8672 – MANIFEST TRAIN

TRACK 5 – DO NOT USE TRAINS ON THIS TRACK!

 

SOUTH STAGING

TRACK 1 E CSX 870 – INTERMODAL TRAIN

TRACK 1 W CSX 6898 – INTERMODAL TRAIN

TRACK 2 E CSX 5970 – MANIFEST TRAIN

TRACK 2 W AP 302 – MANIFEST TRAIN

TRACK 3 E CSX 5972 – AUTO RACK TRAIN

TRACK 4 E CSX 8905 – STEEL TRAIN

TRACK 4 2 CSX 4035 – STEEL TRAIN

 

Yardmaster and Engine Hostler get copies of Engine Consists as well…

I did make some changes to a couple of trains that start and end in staging. There were 3 trains that I called 'dedicated' trains. One was Tropicana, a train for Cargill with covered hoppers and corn syrup tank cars, and a coal train. I took the Cargill trains (there were 3 sets) and turned them into manifest trains with other freight and they terminate at Rock Ridge Yard. The 8-12 coal car train, has been eliminated and now are on manifest trains as well. The Tropicana 'Juice' Train, now terminates at Rock Ridge Yard instead of going thru the yard and tying up the secondary track outside Rock Ridge Yard. A 14 car juice train can tie up that track for quite a while and hold up other trains entering or departing rock Ridge Yard. This track needs to be clear for the most part as it gives the yardmaster more track clearance to move trains in and out of the yard. This gives the yardmaster more work since there's more cars to handle. The good news that Rock Ridge Yard has 4 arrival/departure tracks to put these freight cars, which has the capability, depending on the track and length of freight cars, to hold 10-13 cars on each track! The Intermodal trains and Auto Rack trains are not affected since they do not go thru Rock Ridge Yard..

Now, a typical operating session with 2-3 locals, work at Rock Ridge Secondary, as well as bringing trains to and from staging lasts approximately 2 ¼ - 2 ½ hours. Every now and then, there’s one person who enjoys running my passenger trains, so we’ll throw one in the mix. Besides, passenger trains do get priority on the railroads!

The sessions are fun, and the comradre is enjoyable as well. If I see we’re a little behind, I’ll decide to only run 2 locals or run 3, but leave the last one in the yard when it returns from the industries it served. We’ll finish it on the next session..

Operating sessions will resume in March. Stay tuned for more updates and the continuous upgrades to the railroad!

Thanks for reading!

 

 

 

 

Tuesday, February 1, 2022

Three Photo Challenge - Penn Central 2022 Calendar

Greetings followers of the Atlantic Pacific Railroad and my blog. This post is not the usual three layout operating session photos. It's called a Three Photo Challenge and is the brainstorm of Sir John and PC Ralph, who are the founders of the Penn Central Car Movements.

Late 2021 I was asked if I would be up for this challenge. It's more of a two part challenge. The first part is to create a photo on your layout that replicates as best as possible a photo from the Penn Central Historical Society 2022 Calendar. The second part, which will come closer to the end of this year, involves photos from the Penn Central Magazine, which is published three times a year. 

In the past, I've always raved about both Sir John's New York Central Layout and PC Ralph's Kings Port Division. They've done a great job with authentic engines, cars and scenery. So make sure you check their blog posts when you read this!

Let's begin the challenge...

First photo challenge I attempted is the April 2022 photo. It's a hopper car train with a GP 38 on the lead...


My photo has PC GP38 7783 followed by GP38-2 7983 with GP40 3175 and GP40 3111....



Next up is the September 2022 photo of the end of the train with a PC N5C caboose...


My version is close, using a PC N5 caboose, made by Bowser. Notice the difference in the windows. I tried to replicate the box car colors as best as possible...


That box car in front of the caboose is a familiar car from our virtual op sessions. Then we have a Railbox car, couple other cars and another Railbox car....

Finally, my third photo challenge is the photo from July 2022. This one features one of my favorite engines and my favorite ELECTRIC engine, the GG-1...

While the photo is showing a PRR single stripe, I show the re-lettered engine with the PC logo on it and a Budd PC coach behind it...


We've done our best here, and I hope the judges will be pleased with the photos. 

Make sure you check out both Sir John's and PC Ralph's Three Photo Challenge!

Thanks for reading!!

Sunday, December 19, 2021

P.C.C.M. #89 Part 2 - Here Comes The Coal! Here Comes The Coal!!

Welcome back to the inbound portion of Penn Central Car Movement #89 between Sir John's New York Central Train Layout and my Atlantic Pacific Railroad...

EB #8163 has started to work on the return of Extra #3175 from Hudson Coal and Terminal Yard on the N.Y.C.T.L. The train arrived overnight and they need to get the train ready for the AP crew to bring it to Rock Ridge Yard...


We see PC #3175 idling on Weehawken track #1. A couple tracks over are a pair of GP38-2 engines that will haul the loaded coal cars to Rock Ridge Yard....


The PC caboose is being pulled from the train..



...And the AP caboose is added...



EB #8163 is back over on the storage tracks at Weehawken that the PC and AP share...


PC #3175 has cut away from the train. Engine hostler 1:87 Scale Norman will move the engines and get the train ready to depart...


The engines are added and will head out to Rock Ridge Yard as AP train WR-1..


The crew gets the signal and 1:87 Scale Steve opens up the throttle and makes a mad dash to get out of Weehawken. Let's watch what happens...


Now thru West Harold...


AP train WR-1 checks in at South Tower with 1:87 Scale Rich for instructions into the yard...


Looks like 1:87 scale Stuart has lost his footing in the yard after being told he's going to help out in the yard with some 'maintenance' duties...


1:87 Steve pulls the Geeps on the side so the yard crew can do their thing...


AP MP15DC #107 is called to shove the coal cars to R.M.O. Electric. 1:87 Scale NJ John will make the moves...


NJ John finished the shove and heads back to the yard....


Over at R.M.O. Electric, AP SW1500 #100 once again has 1:87 Scale JP in the cab. He's a veteran on the railroad and will handle dropping the cars in the power plant...





Let's watch the moves being made...


JP hard at work as he knows the cars need to be spotted in a certain order...



The final moves are made...


And that concludes the special coal train action on both Sir John's New York Central Train Layout and my Atlantic Pacific Railroad.

Don't forget to check out the other P.C.C.M. #89 moves between Sir John's N.Y.C.T.L. and PC Ralph's K.P.D. Railroads..

Thanks for reading and enjoy the holiday season! 




Friday, December 17, 2021

P.C.C.M. #89 Part 1 - Winter Time Means More Coal To The A.P.R.R.

Welcome to Penn Central Car Movement #89, a special two layout movement between Sir John's New York Central Layout and my Atlantic Pacific Railroad. There will be another special movement going on at the same time between Sir John's layout and PC Ralph's Kings Port Division Railroad. Make sure you check out both blogs!!

This time of the year brings out a special call for coal from Hudson Coal on the N.Y.C.T.L. R.M.O. Electric will have the A.P.R.R. send a dozen hoppers to Hudson Coal for loading and bring them back to the power plant. That supply should get them thru a good part of the winter....


AP SW1500 #100 is called to action today. 1:87 Scale JP handles this area, and will pull the cars from the power plant and shove them to Rock Ridge Yard...


JP will pull all 12 coal hoppers from the plant. Even though the plant will be empty, they still have a few days supply on hand, just in case the return train gets delayed...


This train has a mix of coal hoppers with various load capacities. That EL coal hopper can handle up to 100 tons of coal...


JP starts to build the train...




There'a mix of AP, EB, EL, Erie & HRC coal hoppers for this run....



Here we go.. the move to Rock Ridge Yard begins...



Let's watch the move to Rock Ridge Yard...


The cars are dropped and JP returns back to the tracks at R.M.O. Electric...


Over at the yard, 1:87 Scale NJ John is talking to 1:87 Scale Norman about the run to Weehawken. 

NJ John is making sure the coal hoppers are coupled up to his engines. AP U28B #2360 and AP Dash 8 40B #2370 will make this run to Weehawken. At Weehawken, they'll hand the train off to the Penn Central crew..



A quick stop at South Tower for some train orders from 1:87 Scale Tower Operator Rich, and they'll head out...


A signal will be given to the crew by the Little Jamaica tower, and they'll be on their way...


The signal is yellow, and they'll head out...


Next stop... Weehawken!


Over at Weehawken Yard, Empire Belt Rail Road engine #8163 and caboose are ready to swap out the caboose come from Rock Ridge and replace it with a Penn Central caboose as the Penn Central crew will take the train to Hudson Coal..


The crew pulls the caboose..



The AP engines are cut from the train and will be replaced with PC GP40 #3175 for the run to Selkirk, and on to Terminal Yard on the N.Y.C.T.L...



Penn Central caboose #26403 is added to the coal train...



GP 40 #3175 is now in control of the train...


Next stop, Hudson Coal!!


Check back tomorrow for the return of the coal train to Rock Ridge Yard and R.M.O. Electric.

Don't forget to check out the other special Penn Central Car Movement posts on Sir John's N.Y.C.T.L. and PC Ralph's K.P.D. railroads!!

Thanks for reading!